Modular facilities
Fully developed concepts for AI, cloud, colocation and mission-critical IT. Built in phases of 5–10 MW, with a short path from secured site to operation.
facility

We develop modular data centers of 10–25 MW and large-scale campuses from 100 MW upward, tailored to site, power and use. Capacity is built out in phases as demand grows.
Compute-intensive AI models require more power per rack, liquid cooling and a grid connection that will hold for many years ahead. Sites with secured power determine where the next generation of data centers will be built.
At the same time, demand is growing for cloud services, colocation and secure operation of critical IT. We develop facilities that meet all these needs, on the same technical foundation and with a tailored design.
We work in two size classes. Both are based on the same technical standard, so that experience, suppliers and quality assurance carry over from project to project.
Fully developed concepts for AI, cloud, colocation and mission-critical IT. Built in phases of 5–10 MW, with a short path from secured site to operation.
Concepts for sites where power and land can support much larger volumes. The campus is built out in phases, with its own power infrastructure and space for energy storage.
Power, cooling, redundancy and capacity per rack are sized according to how the facility will be used.
High power per rack and direct liquid cooling for training and inference of AI models.
Large, contiguous halls that can be built out in phases as the platform grows.
Separate IT zones with dedicated supply make it possible to host several customers in the same facility.
Redundant power paths, backup energy and a clear operating organization for systems that must not stop.
We follow technology developments in liquid cooling, heat recovery, water management, energy storage and flexible power use. What proves itself is brought into projects early, with reliability and verifiable benefit as the starting point.
The right conditions create capacity – when power, land and grid converge

A large share of hydro, nuclear and wind power provides low-emission electricity, and a power system with a long track record of reliability.
The cold climate allows facilities to use free cooling for much of the year, which lowers energy consumption.
A predictable regulatory framework, a stable economy and EU membership provide security for long-term investments.
Well-developed fiber networks and a large pool of engineers make it possible to build and operate advanced facilities.
Every development follows the same five steps. This makes projects comparable and decisions clear.
We define IT load, availability, operating model and potential future capacity.
We gather site data, grid connection, zoning conditions and environmental requirements.
We select hall size, number of floors, equipment yards and phasing.
Technology and construction contracts are competitively tendered on equal terms, for the best performance and total cost.
We lead construction, deliveries, testing and handover to operation, with room for the next phase.

The first phase is designed for independent operation, with its own power, cooling and backup energy. The next phase is built when the customer, the power and the property allow, without the first having to be rebuilt.
This means capital is committed only when there is real demand, and that the facility can grow from 10 MW to 25 MW and beyond.

Tell us about your requirements for power, availability and schedule, and we will show you how a facility can be designed for you.