Smooths out variations in the grid
Batteries can quickly absorb or deliver power and help balance the power system.

We develop large-scale battery energy storage, from site selection and grid studies to permits, partner structure and operation, both standalone and integrated with our data centers.
As more electricity comes from wind and solar, the ability to store energy and shift it in time becomes increasingly important. Battery storage can balance the grid within seconds and relieve it when the load is at its highest.
For a data center site, this means a stronger power system, more flexible operation and more revenue opportunities. For the grid, it means a partner that helps keep it in balance.
Batteries can quickly absorb or deliver power and help balance the power system.
The storage system can offer ancillary services and flexibility when the technical and commercial conditions are in place.
Storage facilitates the integration of variable generation and reduces the need for new grid capacity.

We develop standalone battery storage at sites close to the grid. Projects can be developed for co-ownership, joint ventures or sale once the conditions have been assessed.

A battery system at the data center can serve as backup energy while providing flexibility to the grid. Size and backup duration are chosen according to the operation's availability requirements.
As a worked example, four hours of IT operation at 10 MW corresponds to about 40 MWh of energy, and at 25 MW to about 100 MWh, before cooling and losses.
A good battery project is decided before it is built

MW and MWh are sized according to grid needs, revenue model and site conditions.
Capacity, point of connection and schedule are clarified early in dialogue with the grid operator.
Safety distances, fire protection and risk analysis are addressed from the first layout.
Zoning, environmental, noise and permitting issues are assessed before capital is committed.
Revenue model, budget, partner structure and decision basis are compiled for each project.
Land, proximity to the grid and site constraints.
Dialogue on capacity, connection and technical solution.
Zoning, environment, fire and risk.
Finance, partner structure and decision basis.
We build and lead delivery together with partners, or transfer the project.

Land well located in relation to the grid can become a valuable energy asset. We assess the site's potential and develop the project together with you.